| Editorial
|
|
|
Apart from regular issues of half yearly technical journal - "Steel
in Construction" and quarterly newsletter
- "Insdag News" we have introduced
Insdag E-news bimonthly in order to reach wider cross
section of the professionals, potential steel users.
The circulation is increasing very fast. Our Free
Advisory help desk is available to all. Professionals
interested to receive the e-news regularly may please
send their email address to [email protected]. (Membership
& Advisory Services Dept.)
|
|
.
|
|
| Member
Update |
|
| |
| We like to welcome
our new members enrolled during May to June 2003 |
|
No.
|
Name
|
Category
|
Type
of Work
|
|
1
|
National
Institute of Technology Karnataka, Surathkal
|
Institutional
|
Academic
|
|
2
|
Institute of Technology, BHU
|
Academic
|
|
3
|
National
Institute of Technology, Kurukshetra
|
Academic
|
|
4
|
INSTRUCT,
Bangalore
|
Professional
Body
|
|
5
|
M/s.
RITES Limited
|
Associate
- A
|
Turnkey
|
|
6
|
M/s
Ship Building Centre, Visakhapatnam
|
Ship Building
|
|
7
|
M/s
Colour Roof (India) Limited
|
Associate
- B
|
Colour
Roofing
|
|
8
|
M/s.
Goodlass Nerolac Paints Ltd.
|
High
Performance Paints
|
|
9
|
M/s
P.T.Mase & Associates
|
Consultants
|
|
10
|
M/s.
B. Engineers & Builders Ltd.
|
Consultants
|
|
11
|
40
Individuals
|
Individual
|
Professionals
|
|
12
|
20
Individuals
|
Student
|
Civil
& Arch
|
|
| Happens
In India |
| Fast
Track Construction:
|
|
Pre-Engineered Building
The Main Plant for Groz Engineering
Tools is one of the largest industrial Pre Engineered Building
structures in North India. The building measures 160 m x
80 m (518�4� x 259�3�) and �12.75m high. It is located within
a 6 Acres Industrial Complex in Gurgaon, Haryana. The internal
systems are designed to a high degree of flexibility in
order to adapt to changing layouts and process requirements
such as electrical, compressed air, treated water and machine
loading. The basic framework follows a grid of 8.0m longitudinally
(along 160 m. length) and 15.0m (along 80 m. length) transversely.
The end bay on one eave is 17.5m..
Architect
/ Design Team : Incubis Consultants (I) Private Ltd,,
Structural Consultant : M/s D. P. Adhikari Charu Engineering
Consultants
Fabricator : M/s�
Interarch
|
|
|
|
Street
Furniture
|
|
|
Bus Shelter
The
concept of Fabricated Steel Bus Queue Shelters was developed
by M/s Incubus. The dynamic design is an open, barrier-free
space, with easy access for even physically challenged persons.
The Shelter has five pillars making up four bays. Each pillar
is mounted on a pre-cast RCC foundation block. The pillars
are made of ISLC 200 sections butt-welded toe-to-toe. The
pillars are connected with purlins at the roof level and
114mm nominal diameter pipes at the seating level. Two bays
have Kota stone seats bonded to gussets welded to the pipes.
The subsequent bays have a pair of SS pipes each for commuters
to lean/sit on. All seats and leaning pipes are angled towards
the approaching traffic. All features have been designed
keeping in mind off-site fabrication and rapid on-site assembly.
For corrosion protection synthetic enamel paint was used
Architect / Design Team
: Incubis Consultants
Structural Engineer : PK-Peu Das, New Delhi
Contractor / Builder: PWD.
|
|
| Around
The World |
|
Aesthetics
and Prestige
|
|
With
a steel structure you will get No limits for Architectural
design
|
|
|
Guggenheim
Museum, Bilbao
The museum, constructed to house the
collections of modern art in the world, is located on
the bank of the river in Bilbao. The complex consists
of 11 inter-connected buildings with complex shapes
and curving surfaces. These are accommodated within
a steel framed skeleton which provided the designers
with the opportunity to create such a free-form structure.
Architects : Frank
O. Gehry & Associates Inc. Santa Monica, California
Structural Engineers : Skidmore Owens & Merril,
Chicago
|
|
|
Environment
|
|
With
a steel structure you will get Lower transportation
requirements
|
|
|
Kansai Airport, Osaka, Japan
The
airport was built on a man-made island, and much of
the steel framed structure for the terminal was fabricated
in the UK and transported to site by ship. Despite
the complex geometry of the structure and the long
shipping distances, construction was completed within
36 months.
Architects : Renzo Piano
Structural Engineers : Ove Arup & Partners International
|
|
|
| Skill
Development Programme |
Electronic
Info |
- Refresher course on Welding
of Structural Steel at Jamshedpur, on 9th August,
2003
|
| |
� www.engr.psu.edu
- American Steel Institute
� www.buildingestonia.com
-Swedish Inst. of steel const.
�
www.steelbuildingsupplier.com - Steel bldg.� supplier
�
www.steelbiz.org - Steel Constr. Inst. , UK
� www.steel-insdag.org
- Instt.for Steel Dev. & Growth |
|
| Your
Reflections |
We
would be glad to publish details of any noteworthy
steel intensive structures that you may have come
across or executed recently. Your opinion on coverage
and further suggestion will help us to improve continuously.
In case you are not interested to receive free E-newsletter
just mail us to:
[email protected]
(Membership & advisory Dept.)
|
|
| Few
Forthcoming Projects |
|
|
Client
|
Project
|
How to
reach
|
|
1)
|
Himachal Pradesh Government
|
Construction
of a 334.9m long cable stayed bridge connecting Thalai
area to Swargat in Bilaspur. An investment of Rs.400
million is envisaged.
|
Govt. of Himachal Pradesh, Public
Works Dept., Division No. 2, Bilaspur. 174 001� Mr.S.K.Sonkar, Exe. Engr. Tel- (01979)
222551
|
|
2)
|
Chhattisgarh Govenrment
|
Planning
to upgrade the rural roads:
�
21 roads - 180kms
in Bastar
�
38 roads - 219kms
Bilaspur
�
17 roads - 80kms
in Dantewade
�
33 roads � 150kms
in Durg
�
18 roads � 80kms
in Kanker
�
29 roads � 229kms
in Koria
�
20 roads � 202kms
in Raigarh
�
40 roads � 275kms
in Raipur
�
32 roads � 294kms
in Sarjuga
|
Govt. of Chhattisgarh, Off.
Of� Dev Comm.,
Pradhan Mantri Gram Sadak Yojona, Civil Lines, Raipur, Chhattisgarh. Tel- (0771) 2429666, Fax: 2424919
(Mr.R.K.Khare, Ch.Engr.)
|
|
3)
|
Ministry of Road Transport &
Highway
|
Constructional
Work :
� On Barasat-Behrampur section from KM 31 to KM 193 on
NH-34
� On Farakka-Raiganj section from KM 297 to KM 398 on
NH-34.
|
Ministry of Road Transport &
Highway, Transport Bhawan, Parliament Street, New
Delhi
� 110001. Tel (011)-23719850. Fax: 23719850 (Mr. A.P.
Bahadur, Ch. Engr.-PIC)
|
|
4)
|
Kanpur Nagar Nigam
|
Plans
to set up a modern abattoirs at Kalyanpur Shivali Road at a cost of Rs.140 million.
|
Kanpur Nagar Nigam, Office of
Chief Engineer, AdministrativeBuilding, Motijheel,
Kanpur, Uttar Pradesh Tel-(0512) 2290662
|
|
5)
|
Delhi Municipal Corp.
|
Plans
to set up a 28 floor Civil Centre over 11.54acres
at J.N. Marg at a approx cost of Rs. 3,500 million.
|
Municipal Corp. of Delhi, Town hall, Chandni Chowk, New Delhi-110 006. Tel
(011) 23961012 / 23967315 Fax 23965016
|
|
6)
|
Tripura Jute Mills Ltd.
|
Plans
to set up a 1005 export oriented hydrocarbon free
jute yarn mill at Hapania in Agartala district
|
Tripura Jute Mills Ltd., Hapania,
P.O. ONGC, Agartala 799 014, Tripura, Tel (0381) 2230496/97.
Fax 2230497 (Mr.M.L.Das, MD)
|
|
7)
|
Mumbai Metropolitan Region Dev.
Authority
|
Strengthening
of Santacruz-Chembur link road section 1 from CH.0
to CH.1335 and CH.2775 to CH.3400 at a cost of Rs.390million
in 14 months.
|
Mumbai Metropolitan Region Dev.
Authority, MMRDA Building, 8th Floor, Bandra-Kurla Complex, Bandra(E),
Mumbai 400 051. Tel (022) 26590001, Email:[email protected]
|
|
8)
|
Rewa Tollways Pvt. Ltd.
|
Upgradation
of the 247kms Rewa-Jaisinghnagar-Shahdol-Amarkantak Road at a cost of Rs.1,100 million on BOT basis.
|
Rewa Tollways Pvt. Ltd, C/o
IJM Infrastructure India Ltd., Plot No. 646-A, Road
No.36, Hi-Tech City Road, Jubilee Hills, Hyderabad
500 033. Tel (040) 23541984 / 23554375 fax: 23600439
|
|
9)
|
Ircon International Ltd..
|
NTPC
� constructs a railway siding for transportation of
coal for Talcher Power Station, Angul Orissa.
|
Ircon International Ltd., Office
of the Deputy General Manager-Civil, Talcher STPP,
P.O.Deepshikha, Dist. Angul 753 147 Tel (06760) 244370
/ 244632 / 247981
|
Ref : Recorder
of New projects May/June 2003
|
| |
|
|
Editorial
Board :Dr.T.K.Bandyopadhyay ,Jayanta Saha &� Nilanjan Basu
Contact Us:
ISPAT NIKETAN, 1st Floor; 52/1A Ballygunge
Circular Road, Kolkata
- 700 019, W.B.
Phone : (033) 2461 4047/45 ; Fax : (033) 2461 4048
Email : [email protected]
|
|